01
Methodology Development
Developing the demolition methodology for the specific asset — structural form, condition, hazardous materials, site constraints and programme requirements.
Demolition Planning
Professional Projects Group provides independent demolition planning for industrial asset owners across Australia — methodology development, sequencing, programme logic and constructability review before contractor engagement.
What we do
Demolition planning is the process of translating a defined scope into a practical delivery strategy — methodology, sequencing, access, temporary works, hazardous materials management, waste pathways and programme. Done well, it gives the owner a sound basis for procurement and a clear framework for managing delivery.
Professional Projects Group develops demolition plans independently of contractors, which means the methodology reflects the asset and the owner's requirements — not a preferred delivery approach or available plant. We work across refineries, chemical plants, manufacturing facilities, defence assets and major infrastructure.
Planning services
01
Developing the demolition methodology for the specific asset — structural form, condition, hazardous materials, site constraints and programme requirements.
02
Establishing the demolition sequence, programme logic, critical path, key milestones and dependencies — including approvals, investigations and enabling works.
03
Independent assessment of proposed demolition approaches, identifying practical constraints, safety considerations and programme risks before procurement.
04
Integrating hazardous materials management — asbestos, lead, PCBs, contaminated materials — into the demolition plan, including sequencing, controls and waste pathways.
05
Identifying temporary works requirements — propping, shoring, exclusion zones, access structures — and their implications for programme and cost.
06
Developing the waste management strategy — segregation, classification, disposal routes, recycling and scrap recovery — before tender.
Why plan before tender
Demolition planning done before tender gives the owner control over the methodology. When planning is left to the contractor, the approach reflects their preferred method, available plant and commercial position — not necessarily the best outcome for the asset or the owner.
Independent planning also improves procurement outcomes. A well-defined methodology, clear sequencing and a realistic programme give contractors a sound basis for pricing. Contractors pricing an incomplete or ambiguous brief will either price a premium or make assumptions that lead to variations.
Professional Projects Group develops demolition plans that are grounded in the specific asset — its structural form, condition, hazardous materials profile and site constraints. The result is a procurement-ready project basis that supports competitive tension and commercial control.
Common questions
A demolition plan defines how a structure or facility will be demolished — the methodology, sequence, access strategy, temporary works, hazardous materials management, waste pathways and programme. It translates the demolition scope into a practical delivery strategy that can be used for procurement and contractor management.
For complex industrial assets, the demolition plan should be developed independently of the demolition contractor. Independent planning gives the owner control over the methodology and a sound basis for procurement. Contractor-developed plans reflect the contractor's preferred approach, which may not be the best outcome for the owner.
Demolition planning should start before procurement. The plan needs to be sufficiently developed to support tender documentation, contractor briefings and evaluation. Starting planning after the tender is issued means the methodology is defined by the contractor, not the owner.
A constructability review is an independent assessment of a proposed demolition approach — checking that the methodology is practical, safe and achievable given the specific site conditions, structural form, hazardous materials and programme constraints. It identifies issues before they become delivery problems.
Discuss a project
If you are planning a demolition project and want independent methodology development, constructability review or programme planning, contact Professional Projects Group to discuss your requirements.
Related insights